The composition and operation steps of the completion wellhead device

news

The composition and operation steps of the completion wellhead device

1.Well completion method

1).Perforating completion is divided into: casing perforating completion and liner perforating completion;

2). Open-hole completion method ;

3). Slotted Liner completion method ;

4). Gravel Packed Well Completion Methods are divided into: open hole gravel packed well completion, casing gravel packed well completion, and pre-packed gravel wire screen;

2.Completion wellhead device

asvb

A well is composed of three parts from top to bottom: the wellhead device, the completion string and the bottom structure.

The wellhead device mainly includes three parts: casing head, tubing head and production (gas) tree. The main function of the wellhead device is to suspend the downhole tubing string and casing string, seal the annular space between the tubing, casing and the two layers of casing. Key equipment for controlling oil and gas well production; reinjection (steam injection, gas injection, water injection, acidification, fracturing, chemical injection, etc.) and safe production.

The completion string mainly includes tubing, casing and downhole tools combined according to certain functions. Running the completion string to start normal production of the production well or injection well is the last step of the well completion. The types of wells (oil production wells, gas production wells, water injection wells, steam injection wells, gas injection wells) are different, and the completion strings are also different. Even if they are all oil production wells, the oil production methods are different and the completion strings are also different. The current oil production methods mainly include self-injection oil production and artificial lift (rod pump, hydraulic piston pump, submersible electric pump, gas lift) oil production, etc.

The bottom hole structure is an organic combination of tools and strings connected to the lowest end of the completion string that match the completion method.

3. Main operational steps of well completion

1). Place the surface equipment according to the design requirements

2). Setting up drill pipe or tubing column

3). Install blowout preventer/function/pressure test

4). Scraping and washing of tubing

5). Perforation calibration

6). Throwing rods for ignition

7). Backwash/washout

8). Scrape and wash again

9). Lowering the packer

10). Lower sand control column

12). Lower production column

13). Remove Wellhead Blowout Preventer

14). Installation of wellhead recovery tree

15). Unloading

16). Acceptance and delivery of well